翻訳と辞書
Words near each other
・ Okavango
・ Okavango Basin
・ Okavango Delta
・ Okavango dwarf gecko
・ Okavango mud turtle
・ Okavango River
・ Okavirus
・ Okaw Group
・ Okaw Township, Shelby County, Illinois
・ Okaw Valley Conference (Illinois)
・ Okawa
・ Okawa Dam
・ Okawa Museum of Art
・ Okawa Point
・ Okawa Shaznay
Okawachi Pumped Storage Power Station
・ Okawala
・ Okawara
・ Okawville High School
・ Okawville Township, Washington County, Illinois
・ Okawville, Illinois
・ Okay (band)
・ Okay (disambiguation)
・ Okay (film)
・ Okay (name)
・ Okay (song)
・ Okay Airways
・ Okay Alright
・ Okay Arpa
・ Okay Awesome


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Okawachi Pumped Storage Power Station : ウィキペディア英語版
Okawachi Pumped Storage Power Station

The Okawachi Pumped Storage Power Station (大河内発電所) is a large pumped-storage hydroelectric power station in Hase, Kanzaki District, in the Hyōgo Prefecture of Japan. With a total installed capacity of , it is one of the largest pumped-storage power stations in Japan.〔(【引用サイトリンク】url=http://www.jepic.or.jp/en/data/EPIJ2012Japan%20data.pdf )〕 The facility is run by the Kansai Electric Power Company (KEPCO).〔(【引用サイトリンク】url=http://www.jepoc.or.jp/hydro/index.php?_w=usData&_x=detail2&pp=2&OwnerNo=006&AreaNo=06&RiverSys=6200&fd=1 )〕 The power plant started operation in October 1992 and all four units were commissioned by June 1995.〔(【引用サイトリンク】publisher=Suiryoku )
Like most pumped-storage facilities, the power station uses two reservoirs, releasing and pumping as the demand rises and falls.
The Ota artificial lake is the upper reservoir, and is contained by 5 dams, numbered Ota Dam 1 to 5. The reservoir is fed by the river Ota. Hase reservoir is the lower reservoir and is contained by the Hase Dam. The upper Ota dams are rock-fill dams, while the lower Hase Dam is a gravity dam.〔(【引用サイトリンク】url=http://damnet.or.jp/cgi-bin/binranA/enAll.cgi?db4=1518 )
The upper Ota reservoir was built during the Meiji period to feed the . The plant started operation in December 1909 with a maximum output of 1450 kW. with a generation capacity of 720 kW was added in May 1919.〔〔
The enlargement of the Ota reservoir and the building of the new Hase lower reservoir was implemented by Kansai Electric Power Company, with start of operation of the new pumped storage plant in 1992. The plant reached the current capacity in 1996 with all the four units in operation.〔
The power station employs four generation/pumping units. Two of the units are adjustable speed systems manufactured by Hitachi, allowing for a rapid variation of power levels during both pumping and generation. This allows the power station to respond more effectively to grid requests for the balancing of demand and supply, a role which is usually performed by thermal power plants. These units were the first large-capacity adjustable-speed pumped storage hydroelectric systems in the world.

Ota I Dam.jpg|Ota Dam 1
Ota II Dam.jpg|Ota Dam 2
Ota V Dam.jpg|Ota Dam 5
Hase Dam (Hyogo) 3.jpg|Hase Dam

== See also ==

* List of power stations in Japan
* Hydroelectricity in Japan
* List of pumped-storage hydroelectric power stations

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Okawachi Pumped Storage Power Station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.